Skip to content

schedule.showMaterialConstraints ​

← Back to the parameter index

Opens the material movement panel under the same condition; ignored while schedule.showConstraints is true because APS shows the secondary panel first.

This is a compact property lookup. Use the contextual guide below for the complete feature model, configuration sequence, interactions, examples, and limitations.

Context
Gantt settings
Accepted value
boolean
Required
No
Default
false

User scenarios

  • Show material movement as soon as a schedule opens.

Related parameters

Contextual guide and evidence

  • Contextual guide: Open the complete human guide
  • Source: apps/panel/src/features/panels/variants/gantt/utils/gantt-constraints-panel-intent.ts, symbol shouldShowMaterialConstraints
  • Example coverage: Missing — No Settings API example sets this key.
  • Demo coverage: Missing — The local Gantt demo opens material movement through its toolbar action, not through this key.

The panel source named above remains authoritative for runtime behavior. This secondary reference page is generated from the reviewed parameter matrix and does not replace the contextual guide.