Appearance
schedule.{constraintsTooltipConfig|flowArrowTooltipConfig|operationInfoConfig|operationTooltipConfig|producerArrowTooltipConfig|supplyArrowTooltipConfig|supplyTooltipConfig}.*.order
Order of an explicitly configured display field, including a dependency-arrow tooltip field added in APS 1.20.
This is a compact property lookup. Use the contextual guide below for the complete feature model, configuration sequence, interactions, examples, and limitations.
- Context
- Gantt display settings
- Accepted value
number- Required
- No
- Default
- No documented default.
User scenarios
- Order Gantt tooltip, bar, or dependency-arrow fields.
Related parameters
Contextual guide and evidence
- Contextual guide: Open the complete human guide
- Source:
apps/panel/src/features/panels/variants/gantt/utils/gantt-settings-transform-config.ts, symbolTooltipFieldConfig - Example coverage: Complete — The guide orders a producer-arrow tooltip field.
- Demo coverage: Partial — The fixture demonstrates the existing operation display contract; its schedule data does not produce a dependency arrow. Open the runnable demo .