Skip to content

schedule.{constraintsTooltipConfig|flowArrowTooltipConfig|operationInfoConfig|operationTooltipConfig|producerArrowTooltipConfig|supplyArrowTooltipConfig|supplyTooltipConfig}.*.order ​

← Back to the parameter index

Order of an explicitly configured display field, including a dependency-arrow tooltip field added in APS 1.20.

This is a compact property lookup. Use the contextual guide below for the complete feature model, configuration sequence, interactions, examples, and limitations.

Context
Gantt display settings
Accepted value
number
Required
No
Default
No documented default.

User scenarios

  • Order Gantt tooltip, bar, or dependency-arrow fields.

Related parameters

Contextual guide and evidence

  • Contextual guide: Open the complete human guide
  • Source: apps/panel/src/features/panels/variants/gantt/utils/gantt-settings-transform-config.ts, symbol TooltipFieldConfig
  • Example coverage: Complete — The guide orders a producer-arrow tooltip field.
  • Demo coverage: Partial — The fixture demonstrates the existing operation display contract; its schedule data does not produce a dependency arrow. Open the runnable demo .

The panel source named above remains authoritative for runtime behavior. This secondary reference page is generated from the reviewed parameter matrix and does not replace the contextual guide.