apps/panel 0.80.5
Released on 12 September 2026. Previous release: 0.80.4.
What changed
- When the user chooses a dependency-highlighting command in the operation context menu, the panel passes the
POST /Schedule/GetWorkOrderOperationDependenciesresponse to Gantt. Gantt now matches each supply entry of that response, by itssupplyEventGUID, to the supply marker with the same GUID in the opened schedule and draws a supply arrow from that marker to the operation. The previous Gantt version did not draw these supply arrows. - The supply-arrow tooltip can show the name, designation, and unit of measure of the supplied material. Gantt takes them from the material of that supply whose GUID matches the dependency entry. If the supply in the schedule response has no such material, the fields have no value.
Configuration
Tooltip fields remain optional: a supply-arrow tooltip shows only the fields listed in supplyArrowTooltipConfig. To show the material, add these Settings API entries under the schedule prefix and replace the labels with the text the tooltip should display:
text
schedule.supplyArrowTooltipConfig.materialDefinitionName.label = "Material"
schedule.supplyArrowTooltipConfig.materialDefinitionItemId.label = "Designation"
schedule.supplyArrowTooltipConfig.materialDefinitionUOM.label = "Unit"Known limitation
@mes/aps 1.21.0 contains a material-movement graph, but the panel does not show it: the panel neither requests material-movement data nor offers an action that opens the graph. The schedule.showMaterialConstraints setting has no effect.
Dependency updates
@mes/aps:1.20.0→1.21.0. Version1.21.0draws supply arrows for highlighted dependencies and adds supplied-material fields to their tooltip; its material-movement graph is not available in the panel.
Updated documentation
- The dependency-arrow tooltip guide lists the new supply-arrow fields and when they have no value.
- The defaults and precedence list states that
schedule.showMaterialConstraintshas no effect.